1

Energy-Efficient 400 kW Chiller Installation Delivers £50,000 Yearly Cost Reduction on Energy and 200 Tonnes CO₂ Reduction

News Discuss 
Project Highlight At a prominent confectionery site in York, Newsome has commissioned a cutting-edge 400 kW chiller, marking the successful conclusion of the project. Designed to advance ESG targets, the installation enhances system dependability while minimising overall power consumption and CO₂ levels. https://singnalsocial.com/story5706373/high-efficiency-400-kw-chiller-installation-secures-fifty-thousand-pounds-annual-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-saving

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story